Skip to main content

Footway maintenance schemes

Holdenhurst Road improvements

In October 2023, we started work to the footways in Holdenhurst Road from Wellington Road to just past Buchanan Avenue.

The footways require a number of drainage, crossing and tarmac repairs. Access will be maintained to all shops, businesses and residential properties during these footway works which are planned to conclude in spring of 2024.

Once the footway is complete major resurfacing works will be carried out in Holdenhurst Road as part of a 2 phase operation:

  • Wellington Road to Springbourne junction - May 2024
  • Sections of carriageway between Springbourne junction and Buchanan Avenue - 2025/26

Small footway schemes

The refurbishment or slurry sealing (pot hole prevention) of footway only.

Works are carried out with minimal disruption wherever possible unless the site requires a road closure.

Work is planned to be carried out over the coming months at the following locations . More information will be made available later.

  • Argyle Road
  • Asquith Close
  • Baldwin Close
  • Bub Lane
  • Buccaneers Close
  • Coastguard Way
  • De Haviland Way
  • Disraeli Road
  • Grafton Close
  • Harbour Crescent
  • Johnstone Road
  • Mudeford
  • Mudeford Lane
  • Palmerston Avenue
  • Pauntley Road
  • Pelham Close
  • Purewell Close
  • Russell Drive
  • Stanpit

The programme of works listed above is subject to constant review depending on out turn costs of individual schemes, changing priorities indicated by routine highway inspections, or particularly adverse deterioration due to factors such as severe winter weather, flooding, etc. All dates are provisional and subject to change.

Have you encountered a problem with this page?